I haven't been working as much since being prego with twins drains me of all energy, but I am getting a little bit back in my groove again :) I figured out if I can make at least 1-2 things a week I can get done 18-36 projects before the twins are born...but since I will be huge by 30 or so weeks I really only have 10 weeks so only 10-20 things to get done. But I am doing good so far. I have gotten done my daughters nightstand and dresser. Two other nightstands, and the changing table.... and that was just in the past two weeks. The biggest problem I seem to have is getting my husband or my dad to help me move something to an area where I can paint it or to take it to an area where I can get a good picture of it. So right now I just have a picture of the changing table, which I think came out really good. So here it is....
And here is what it looked like before...
It was a really old dresser with a little vanity thing on top. I took the top part off, but I didn't fill the holes in case I wanted to put it back on after it stops being a changing table.
Here's another before and after. This one sold to a couple that was expecting as well and I think they used it as a changing table too.
No comments:
Post a Comment